Offshore Construction
Steelwork and pipework prepared for marine and offshore conditions, planned around lifting, transport and the weather windows that govern the work.

Built for a harsh environment
Offshore structures are judged by how they behave over years of exposure to waves, salt, wind and cyclic loading. Our fabrication work is planned with those conditions in mind, from material selection and weld detailing to surface protection.
Good offshore work depends on early planning. Lifting arrangements, transport routes and the marine installation method all shape the way a component is divided and fabricated.
What a marine package needs to define
- Design loads, environmental criteria and the applicable code
- Corrosion protection and coating system for each zone
- Lifting points, rigging plans and centre of gravity
- Transport method, sea fastenings and receiving port arrangements
- Inspection, documentation and handover requirements
- Access and interface details with the installation contractor
Stages of an offshore package
Phase 01
Engineering review
Drawings and load cases are checked against the installation method so that the fabrication breakdown is sound.
Phase 02
Fabrication and welding
Members and nodes are fabricated and welded to qualified procedures, with critical welds inspected as the work progresses.
Phase 03
Surface protection
Blast cleaning and coating are applied to the specified system, with dry film thickness recorded for each zone.
Phase 04
Load-out and sea transport
The package is lifted, secured and loaded for transport, with the lifting and sea fastening plans reviewed before the move.

Coordinating with the wider project
Offshore work rarely stands alone. Fabrication packages must fit the installation vessel, the quayside and the schedule of other trades. Early coordination on interfaces prevents costly rework when the package reaches site.
For related capability in structural and plant work, see our specialist fabrications and tubular piles pages.
Views from the work


Questions on offshore work
Do you carry out the marine installation?
Our role is the fabrication and preparation of the package. Installation is planned with the marine contractor so that the interface is clear.
How is corrosion protection verified?
Surface preparation and coating thickness are checked against the specification and recorded for each zone of the structure.
What should be agreed early?
Lifting arrangements, transport method, inspection scope and handover documents should be fixed before detailed fabrication starts.
Weather windows, lifting limits and transport dates are set by the project team, so the fabrication programme should keep margin for them.