Civil & Environmental Pipework

Notes on pipework for drainage, water and environmental schemes, fabricated at Néos Engineering.

Civil and environmental pipework carries water, effluent and treated flows through the places people live and work. It has to be fabricated accurately, joined securely and recorded properly, because it is often buried or hard to reach once installed.

We work from the engineer's drawings and the pipe schedule, and we match the fabrication to the way the line will be laid and jointed on site.

Modern office building with glass facade

Pipework for building services and site drainage is set out against the architectural layout, with access points marked clearly.

Fabrication for site

Spools and branches are cut, bevelled and assembled in the workshop wherever possible. Site joints are kept to the number the design allows, which reduces time in the trench and the risk of error.

Each spool is labelled with its drawing reference and its position in the run.

Pipes and fittings arranged in a line

Pipe sections and fittings checked against the spool list before welding.

Environmental schemes

  • Materials chosen for the fluid, temperature and burial conditions
  • Welds examined and recorded for every joint that will be buried
  • Pressure tests carried out where the design requires them
  • As-built records supplied for the asset owner
Green river valley seen from a hillside

Schemes near rivers and wetlands call for careful routing and sound joints. Environmental sensitivity shapes both the pipe material and the way it is installed.

Sequence of work

Step one

Route and spool plan

Spool lengths and joint positions are agreed against the route.

Step two

Workshop fabrication

Spools are cut, fitted and welded under the agreed procedures.

Step three

Delivery and records

Spools travel with their documentation, ready for installation.

Laptop and papers on a workbench

Drawings, weld maps and test records are kept together for each line, so the handover to the client is complete.

For spools that connect to plant or process systems, see fabricated pipework. Welding procedures are described on the welding page.